Yifengshi Shiqiao Bridge Reinforcement Project Commences

Yifengshi Shiqiao Bridge Reinforcement Project Commences Recently, the emergency bridge reinforcement project of the Yifeng Shishi Bridge was officially started.

The Shishi Bridge was built in 1979. The total length of the bridge is 224.76 meters. It is an important bridge connecting Yifeng to the 320 national highway. Due to the heavy pressure of over-restricted vehicles, the bridge surface sinks and the bridge body cracks, posing a potential safety hazard. The Yifeng Highway Sub-bureau actively reported the current situation of the Shishi Bridge to the competent authorities at the next higher level. The bridge was comprehensively inspected by the Technical Bureau of the Provincial Highway Bureau and confirmed as a dangerous bridge. After many efforts, the Shishi Bridge was rebuilt and reinforced. The Yifeng Highway Sub-bureau quickly completed bidding and other work according to regulations, and recently launched a comprehensive project to strengthen the bridge. The reinforced and rebuilt Shishi Bridge has a clear road width of 7.1 meters and a 1 meter wide sidewalk on both sides. The design load is steam level-15 and the trailer is -80. At present, the construction team is building scaffolding to carry out pre-reinforcement work.

Automatic Sliding Door Series and door accessories

automatic doors is the introduction of European advanced technology imported from Germany and configuration , Using the principle of rotating suspension developed luxury automatic door products ,Advanced control system imported from Germany and the motor and reducer , More Comprehensive security requirements of the systems ,showing the beauty of fashion

automatic sliding door,automatic doors,automatic doors motor,fast doors,quickly doors

SHENZHEN HONGFA AUTOMATIC DOOR CO., LTD , https://www.hongfarrs.com